No site selected
Untitled Draft
Inputs changed since last generation —
Site Dashboard
Selected Site
Select lot from Atlas
Area -
Zone -
Max FSR -
Max Height -
Min Lot Size -
Heritage No
Site Boundaries
Proposed Controls
FSR Req: -
:1
Height Req: -
m
Coverage Req: 60%
%
Setback Front
m
Setback Rear
m
Setback Side
m
3D View
Plan
Layout & Controls
Development Type
Subdivision
House
Villa / TH
Apartment
Masterplan
Design Intent
Define your design objectives
Design Quality Settings
Unit Mix
Unit Sizes
Ground Floor
Amenity / Unit
Carpark / Space
Buildings
Constraints
Max Width
m
Max Depth
m
Cores
Balcony
Basement
m²/car
Separation & Access
Min Spacing
m
Max to Core
m
Unit Dimensions
Unit Width
m
Unit Depth
m
Residential
Retail
Commercial
Circulation
Core
Buildings
+ Add Building
Development Summary
-
GFA m²
-
NLA m²
-
Efficiency
-
Units
-
FSR
-
Height
Compliance Status
0 OK
Rule Required Proposed Status
Density
Floor Space Ratio
LEP Cl 4.4
-
Height of Building
LEP Cl 4.3
-
Site Coverage
DCP 4.2.1
-
Min Lot Size
LEP Cl 4.1
- -
SEPP 65 Applicability
SEPP 65
3+ storeys, 4+ units -
Setbacks
Front Setback
DCP 4.2.2
-
Rear Setback
DCP 4.2.2
-
Side Setback
DCP 4.2.2
-
Building Separation
DCP 4.2.3 / ADG
-
Amenity
Solar Access (2hr)
ADG 4A-1
-
Cross Ventilation
ADG 4B-3
-
Communal Open Space
ADG 3D-1
-
Deep Soil Zone
ADG 3E-1
-
Private Open Space
ADG 4E-1
-
Apartment Sizes
ADG Table 4
Per ADG Table 4 -
Apartment Mix
ADG 4J
No type > 75% -
Accessible Housing
LHDG / BCA
20% -
Neighbour Solar (3hr)
DCP 4.2.6
Maintain
Design Standards
Max Floor Plate Depth
ADG 4D
-
Ground Floor Height
DCP 4.2.4
-
Typical Floor Height
BCA D1.6
-
Min Ceiling Height
ADG 4C-1
-
Max Apartment Depth
ADG 4D
-
Balcony Requirements
ADG 4E / Table 5
Per ADG Table 5 -
Storage
ADG 4G
Per ADG Table -
Dead-End Corridor
ADG / BCA
Max 8 units -
Max Travel Distance
BCA D1.4
40m (sprinklered) -
Max Apts per Core
ADG 4F-1
-
Street Wall Height
ADG 3F-1
-
Max Unbroken Facade
ADG 3D-1
-
Upper Level Setbacks
DCP 4.2.3
-
Ground Floor Use
LEP Land Use
-
Parking & Access
Residential Parking Rate
DCP 3.11
-
Accessibility Tier
DCP 3.11
-
Visitor Parking
DCP 3.11
-
Planning Pathway
Pathway Status Timeline Blockers
CDC ✗ NOT ELIGIBLE 10 days FSR +10%
DA (Local) ✓ ELIGIBLE 40-60 days -
DA (Regional) NOT TRIGGERED 60-90 days <$30M CIV
SSD NOT TRIGGERED 6-12 mo <75 units
Variations Required
Assessment Criteria: Is compliance unreasonable? Are there environmental planning grounds? Consistent with zone objectives? View Guidance
⏱️
Total Estimated Timeframe
20 weeks
(12-40 weeks typical)
Approval Cost Estimate
DA Fees
$25,000
Consultants
$85,000
Total Approval Costs
$150,000